Trade discipline

FIELD-READY PROCESS & MECHANICAL PIPING SHOP DRAWINGS. SEE THE WORK.

What we provide

We produce fabrication-ready pipe spool drawings, isometrics, and spool sheets for process and mechanical piping. Each spool is modeled, coordinated, and broken down for the shop — with cut lengths, weld locations, fittings, and bills of material — so your fab shop can build spools that drop in clean in the field.

Delivered on standardized VDClab templates.

Fit

When you need this

Shop-fabricated piping that has to fit field conditions the first time

Congested pipe racks and mechanical rooms needing coordination

A GC or owner requiring coordinated piping shop drawings

A fab shop that needs clean spool sheets with BOMs

Deliverables

What you get

Pipe isometric drawings (dimensioned, with fittings and welds)

Spool sheets broken out for fabrication

Bills of material / cut lists per spool

Coordinated routing that fits the model and the field

PE-stamped sets when the spec calls for it, with pipe supports included.

Carbon steel, copper, ductile iron, stainless — even titanium.

Bundle of insulated pipes with fittings installed to spool drawings

From the field

Case notes

On a university chiller plant the design model didn’t match the field; we dimensioned the piping to centerlines from field data so the contractor could fabricate without waiting on the design team.

On a NJ water-treatment upgrade we drew the process and stainless air-stripper piping, added supports and PE-stamped the set as one package.

The offer

First area field-ready in 10 business days

First area in 10 business days; the rest scheduled in install order.

Quote in 1–2 business days.

LOD 400 fab-ready model.

1,000+ shop drawing projects · 800+ high-rise floors coordinated.

Led by a licensed P.E. in NJ, NY and FL.

If the drawings aren’t approved, we keep fixing them at no charge until they are — and if it’s still not right, you get your money back.

US-based project manager on every job · 50+ person production team · NJ-based MEP engineering firm, PE-licensed in NJ, NY, FL

Every job

What you get on every job

Material list per area

Hanger / insert / field-point layout

Trade-standards setup

Fab export check (SysQue / Revit)

Clash log + RFI tracker

Closeout as-built update

US-based PM + production lead

Quote

How a quote works

01 · Send your drawings.

02 · We review the scope.

03 · Scope, schedule & price in 1–2 business days.

Grooved pipe coupling and flange on insulated mechanical piping

How we work to spec

Standards & technical scope

ASME B31.1, B31.3 and B31.9

Power piping, process piping and building services piping, on the code basis the job is designed to.

ANSI and AWWA, where applicable

Water-service piping drawn to the AWWA and ANSI references the project specifies.

ASME B16.5 and B16.9

Flange ratings and fitting dimensions carried through to the spool.

ASTM material specs

A53, A106 and A312 called out per line, so the shop orders the right material.

MSS SP-58 and SP-69

Pipe support and hanger selection and spacing coordinated with structure.

Sample

What a spool package looks like

See our work

  • Process Pipe · Mechanical Piping

    Water treatment facility — Westchester County, NY (chemical-injection pipe spools, titanium)

    Supply and installation of piping spools for the chemical injection systems at a municipal water treatment facility.

    Similar project? Let's talk
  • Process Pipe

    Stormwater pumping station — Bronx, NY (force mains, valves, submersible pumps)

    Process piping modeling and coordination for a municipal stormwater pumping station upgrade, including the routing of large-diameter force mains, gate valves, check valves and discharge connections for submersible pumps.

    Similar project? Let's talk
  • Process Pipe · BIM Coordination

    Water filtration plant — Westchester County, NY (flanged ductile iron)

    BIM modeling and MEP coordination for flanged ductile iron piping (DIP) process systems. Scope of work includes centrifuge dewatering units, solids flotation systems, sludge and mixing pumps, and complete flanged DIP piping distribution.

    Similar project? Let's talk
  • Process Pipe · BIM Coordination

    Water filtration plant — Westchester County, NY (dewatering and sludge pumps)

    BIM modeling and MEP coordination for flanged ductile iron piping (DIP) process systems. Scope of work includes centrifuge dewatering units, solids flotation systems, sludge and mixing pumps, and complete flanged DIP piping distribution.

    Similar project? Let's talk
  • Mechanical Piping · BIM Coordination

    Hotel — Brooklyn, NY (condenser water, hot water, refrigeration)

    BIM modeling and MEP coordination of the HVAC system: supply, return, outside and exhaust air, plus condenser water, hot water and refrigeration. Scope of work includes AC units, fans, VAVs, air outlets, pumps, cooling towers, heat exchangers, finned tube radiators, and complete ductwork and piping distribution.

    Similar project? Let's talk
  • Mechanical Piping · BIM Coordination

    Hotel — Brooklyn, NY (hydronic piping, mechanical rooms)

    BIM modeling and MEP coordination of the HVAC system: supply, return, outside and exhaust air, plus condenser water, hot water and refrigeration. Scope of work includes AC units, fans, VAVs, air outlets, pumps, cooling towers, heat exchangers, finned tube radiators, and complete ductwork and piping distribution.

    Similar project? Let's talk
  • Mechanical Piping · BIM Coordination

    Industrial HVAC upgrade — NYC metro (chilled water plant)

    BIM modeling and MEP coordination for the HVAC system upgrade. Project scope includes a chilled water system installation with new ACCUs, chillers, pumps and piping distribution.

    Similar project? Let's talk

Process & timeline

How it runs

01

Share your plans

Send drawings, a model, or a markup and we’ll tell you what we need. Need existing conditions? We can 3D scan and verify the site first.

02

We model & coordinate

Build the model, run clash detection across all trades, resolve conflicts.

03

You get fabrication-ready drawings

Spool sheets, duct drawings, plumbing/electrical/FP sets and coordination drawings, all on VDClab templates.

04

Build with confidence

Signed-off coordination and drawings your crew can build straight from.

Real turnaround based on line count and coordination scope before we start.

Questions

Pipe spool drawings: what contractors ask

Can you produce spools with BOMs for our shop?

Yes — spool sheets with cut lengths, fittings, welds, and bills of material, formatted for your fabrication workflow.

Do you coordinate piping with the other trades?

Yes. Piping gets coordinated against duct, plumbing, electrical, fire protection, and structure in the model before spools are issued.

Pipe strainer and flexible connector on mechanical piping

Next step

Got a set of plans? Let’s make them buildable.

Not sure yet? Get a free sample sheet →

Scroll to Top